Full closure of Loop 1604 at I-35 over weekend of July 26-29

Traffic News

Full closure of Loop 1604 at I-35 over weekend of July 26-29
Northeast Side
  • 📰 ksatnews
  • ⏱ Reading Time:
  • 249 sec. here
  • 7 min. at publisher
  • 📊 Quality Score:
  • News: 106%
  • Publisher: 53%

TxDOT will be closing Loop 1604 at I-35 on the Northeast Side over the weekend of July 26-29.

– A major road closure over the weekend of July 26-29 will affect drivers on the city’s Northeast Side .

Thursday, July 25, until Saturday, July 27, 9 p.m. to 5 a.m. Multiple lane closures on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Roy Richard Drive to Schertz Parkway for paving, barrier, and roadworks. Traffic should use next entrance and exit ramps.Through Saturday, Aug. 2, 2025, long-term closure . Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for construction work.

Sunday, July 21, until Saturday, July 27, 9 p.m. to 5 a.m. Full closure northbound frontage road and exit ramp of I-35 from Forum Parkway to Olympia Parkway. for substructure work. Traffic should follow detour signs. Sunday, July 21, until Saturday, July 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway. for bridge structure work. Traffic should follow detour signs.

Sunday, July 21, until Thursday, July 25, 9 p.m. to 5 a.m. Multiple lane closures on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge structure work. Monday, July 22, until Wednesday, July 24, 9 a.m. to 3 p.m. Northbound to southbound frontage road turnaround of I-35 at Evans Road for substructure work.

Monday, July 22, until Saturday, July 27, 9 p.m. to 5 a.m.

Sunday, July 21, until Tuesday, July 23, 9 p.m. to 5 a.m. Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for deck and cap work. Traffic must west Loop 1604 to access southbound I-35 and follow detour signs. Monday, July 22, until Friday, July 26, 9 p.m. to 5 a.m. Full closure on southbound collector ramp of I-35 at the Loop 1604 interchange for column and cap work. Traffic should follow detour signs.Through Monday, Feb. 3, 2025, long-term closure . Full closure on I-35 northbound collector exit ramp and left lane closure on I-35 northbound frontage road from Pat Booker Road to Loop 1604 for bridge work.

Sunday, July 21, until Tuesday, July 23, 9 p.m. to 5 a.m. Alternating lane closures on northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for drilled shaft work. Monday, July 22, until Thursday, July 25, 9 p.m. to 5 a.m. Multiple lane closures on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for bridge structure work.Through Sunday, Sept. 8, long-term closure . Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.

Sunday, July 21, until Saturday, July 27, 9 p.m. to 5 a.m. Multiple lane closures on northbound mainlanes, multiple lane closures on northbound I-35 frontage road and exit ramp closures from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.

Sunday, July 21, until Saturday, July 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs. Through Sunday, August 11, long-term closure . Left lane closure on northbound frontage road of I-35 from Weidner Road to O’Connor Road for construction work.

Sunday, July 21, until Saturday, July 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Tech Com Drive to Weidner Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs. Monday, July 22, until Saturday, July 27, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road, exit ramp closure, and northbound to southbound turnaround closure from Thousand Oaks Drive to Randolph Boulevard for column and cap work. Traffic should follow detour signs.Sunday, July 21, 8 p.m. to 6 a.m. Alternating lane closures on northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for drilled shaft work.

Monday, July 22, until Saturday, July 27, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Walzem Road for column work. Traffic should follow detour signs. Friday, July 26, 9 p.m. to 7 a.m. Full closure on eastbound Loop 1604 connector ramps to I-35 and entrance ramp closure of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for bridge structure work. Traffic should follow detour signs.Friday, July 26, at 9 p.m. until Monday, July 29, at 5 a.m.

Thursday, July 25, 8 p.m. to 6 a.m. Alternating lane closures on westbound mainlanes of Loop 1604 from Pat Booker Road to Nacogdoches Road for bridge deck and barrier work.Sunday, July 21, until Saturday, July 27, 9 p.m. to 7 a.m. Alternating lane closures on eastbound frontage road of I-410 and entrance ramp closure from Perrin Beitel to Austin Highway for striping and barrier work. Traffic should follow detour signs.

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

ksatnews /  🏆 442. in US

Northeast Side

United Kingdom Latest News, United Kingdom Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Full closure of Loop 1604 eastbound at I-10 this weekendEastbound main lines and one westbound lane of San Antonio's Loop 1604 will be closed this weekend at I-10 for TxDOT's expansion project.
Read more »

Drivers to get some breaks from Loop 1604, I-10 interchange construction closures this summerDrivers to get some breaks from Loop 1604, I-10 interchange construction closures this summerDrivers who have encountered constant construction closures during weekends at the Loop 1604 and Interstate 10 interchange on the Northwest Side will be getting some relief this summer.
Read more »

TxDOT reduces San Antonio's Loop 1604 closures for summerTexas Department of Transportation's Loop 1604 expansion project, stretching from I-35 to Bandera Road, will cause fewer closures until after Labor Day.
Read more »

TxDOT reduces San Antonio's Loop 1604 closures for summerTexas Department of Transportation's Loop 1604 expansion project, stretching from I-35 to Bandera Road, will cause fewer closures until after Labor Day.
Read more »

Construction closure scheduled for Loop 1604, I-10 interchange this weekendConstruction closure scheduled for Loop 1604, I-10 interchange this weekendAs part of the Loop 1604 North Expansion project, TxDOT has planned a closure of eastbound Interstate 10 at the Loop 1604 interchange in both directions this weekend.
Read more »

TxDOT: Closures at Loop 1604 and I-10 this weekend are 'major'Major closures will be in place this weekend at the Loop 1604 and I-10 interchange in San Antonio as crews work on bridge construction.
Read more »



Render Time: 2025-04-04 13:54:03